Moore County East 115kV (GEN-2007-057)

Moore County East 115kV is a 34.5 MW wind interconnection project in Moore County, Texas with a current status of withdrawn. It is proposed to connect at Moore County East 115kV.

34.5 MWCapacity
WithdrawnStatus
TXMarket
WindTechnology

Project facts

Canonical nameMoore County East 115kV
Queue IDGEN-2007-057
Statuswithdrawn
Source statusWITHDRAWN
MarketTX
TechnologyWind
Capacity34.5 MW
StateTexas
CountyMoore County
Point of interconnectionMoore County East 115kV
Requested (queue) date2007-12-13
Proposed in-service date
Operational date
Withdrawn date2013-08-07
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata