Moore Field BESS (24INR0598)

Moore Field BESS is a 9.9 MW battery interconnection project with a current status of withdrawn. It is proposed to connect at Transformer - XFMR #2 _x000D_ Station Code - MOORE_FL_x000D_ Load Name - LD2_x000D_ PTI Bus # - 80117_x000D_ Transmission Voltage - 138.

9.9 MWCapacity
WithdrawnStatus
ERCOTMarket
BatteryTechnology

Project facts

Canonical nameMoore Field BESS
Queue ID24INR0598
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyBattery
Capacity9.9 MW
State
County
Point of interconnectionTransformer - XFMR #2 _x000D_ Station Code - MOORE_FL_x000D_ Load Name - LD2_x000D_ PTI Bus # - 80117_x000D_ Transmission Voltage - 138
Requested (queue) date2023-07-12
Proposed in-service date2024-10-05
Operational date
Withdrawn date
DeveloperSBESS TX10 LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata