Moore Field BESS (24INR0598)
Moore Field BESS is a 9.9 MW battery interconnection project with a current status of withdrawn. It is proposed to connect at Transformer - XFMR #2 _x000D_ Station Code - MOORE_FL_x000D_ Load Name - LD2_x000D_ PTI Bus # - 80117_x000D_ Transmission Voltage - 138.
Project facts
| Canonical name | Moore Field BESS |
|---|---|
| Queue ID | 24INR0598 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | ERCOT |
| Technology | Battery |
| Capacity | 9.9 MW |
| State | — |
| County | — |
| Point of interconnection | Transformer - XFMR #2 _x000D_ Station Code - MOORE_FL_x000D_ Load Name - LD2_x000D_ PTI Bus # - 80117_x000D_ Transmission Voltage - 138 |
| Requested (queue) date | 2023-07-12 |
| Proposed in-service date | 2024-10-05 |
| Operational date | — |
| Withdrawn date | — |
| Developer | SBESS TX10 LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata