Moores Hollow PV1, LLC is a 42.0 MW solar+battery interconnection project in Malheur, Oregon with a current status of active. It is proposed to connect at ONTO–WEJN 138kV Line.

42.0 MWCapacity
ActiveStatus
ORMarket
Solar+BatteryTechnology

Project facts

Canonical nameMoores Hollow PV1, LLC
Queue ID562
Statusactive
Source statusConstruction
MarketOR
TechnologySolar+Battery
Capacity42.0 MW
StateOregon
CountyMalheur
Point of interconnectionONTO–WEJN 138kV Line
Requested (queue) date2019-08-05
Proposed in-service date2022-06-01
Operational date
Withdrawn date
DeveloperMoores Hollow PV1, LLC
Utility / transmission ownerIdaho Power Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-17statussuspendedactivehigh
2026-08-03new_projectsuspendedhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: idahopower-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata