Moorhead Northeast Substation 115kV Substation (AFS NJG-2025-003)

Moorhead Northeast Substation 115kV Substation is a 5.7 MW gas interconnection project in Moorhead, Minnesota with a current status of operational. It is proposed to connect at Moorhead Northeast Substation 115kV Substation.

5.7 MWCapacity
OperationalStatus
MNMarket
GasTechnology

Project facts

Canonical nameMoorhead Northeast Substation 115kV Substation
Queue IDAFS NJG-2025-003
Statusoperational
Source statusNone
MarketMN
TechnologyGas
Capacity5.7 MW
StateMinnesota
CountyMoorhead
Point of interconnectionMoorhead Northeast Substation 115kV Substation
Requested (queue) date2025-11-19
Proposed in-service date
Operational date2030-12-31
Withdrawn date
Developer
Utility / transmission ownerMRES

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata