Moorhead Northeast Substation 115kV Substation (AFS NJG-2025-004)
Moorhead Northeast Substation 115kV Substation is a 5.7 MW gas interconnection project in Moorhead, Minnesota with a current status of operational. It is proposed to connect at Moorhead Northeast Substation 115kV Substation.
5.7 MWCapacity
OperationalStatus
MNMarket
GasTechnology
Project facts
| Canonical name | Moorhead Northeast Substation 115kV Substation |
|---|---|
| Queue ID | AFS NJG-2025-004 |
| Status | operational |
| Source status | None |
| Market | MN |
| Technology | Gas |
| Capacity | 5.7 MW |
| State | Minnesota |
| County | Moorhead |
| Point of interconnection | Moorhead Northeast Substation 115kV Substation |
| Requested (queue) date | 2025-11-19 |
| Proposed in-service date | — |
| Operational date | 2030-12-31 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | MRES |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-19 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.