Morbihan - Hopkins 138kV (J1599)

Morbihan - Hopkins 138kV is a 100.0 MW solar interconnection project in Iberia, Louisiana with a current status of withdrawn. It is proposed to connect at Morbihan - Hopkins 138kV.

100.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameMorbihan - Hopkins 138kV
Queue IDJ1599
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity100.0 MW
StateLouisiana
CountyIberia
Point of interconnectionMorbihan - Hopkins 138kV
Requested (queue) date2020-06-23
Proposed in-service date2023-09-01
Operational date2023-09-01
Withdrawn date2026-02-13
Developer
Utility / transmission ownerCleco Power LLC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata