Morning Glory Solar (23INR0224)

Morning Glory Solar is a 122.4 MW solar interconnection project in Tom Green, Texas with a current status of operational. It is proposed to connect at tap 345kV 7077 Amos Creek - 76009 Twin Buttes.

122.4 MWCapacity
OperationalStatus
Tom GreenMarket
SolarTechnology

Project facts

Canonical nameMorning Glory Solar
Queue ID23INR0224
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketTom Green
TechnologySolar
Capacity122.4 MW
StateTexas
CountyTom Green
Point of interconnectiontap 345kV 7077 Amos Creek - 76009 Twin Buttes
Requested (queue) date2021-06-16
Proposed in-service date
Operational date2026-03-31
Withdrawn date
DeveloperArmadillo Solar Center, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata