MORRILTON EAST - Atkins 161 kV (J1592)

MORRILTON EAST - Atkins 161 kV is a 200.0 MW solar interconnection project in Pope, Arkansas with a current status of withdrawn. It is proposed to connect at MORRILTON EAST - Atkins 161 kV.

200.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameMORRILTON EAST - Atkins 161 kV
Queue IDJ1592
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity200.0 MW
StateArkansas
CountyPope
Point of interconnectionMORRILTON EAST - Atkins 161 kV
Requested (queue) date2020-06-18
Proposed in-service date2023-04-01
Operational date2023-04-01
Withdrawn date2023-12-08
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata