Morris Park 12.47kV (AC1-018)
Morris Park 12.47kV is a 1.4 MW solar interconnection project in Warren, New Jersey with a current status of withdrawn.
1.4 MWCapacity
WithdrawnStatus
—Market
SolarTechnology
Project facts
| Canonical name | Morris Park 12.47kV |
|---|---|
| Queue ID | AC1-018 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | — |
| Technology | Solar |
| Capacity | 1.4 MW |
| State | New Jersey |
| County | Warren |
| Point of interconnection | — |
| Requested (queue) date | 2016-07-13 |
| Proposed in-service date | 2019-07-01 |
| Operational date | — |
| Withdrawn date | 2020-08-04 |
| Developer | — |
| Utility / transmission owner | JCPL |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata