Morris Park 12kV (W3-152)

Morris Park 12kV is a 2.5 MW solar interconnection project in Warren, New Jersey with a current status of withdrawn.

2.5 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameMorris Park 12kV
Queue IDW3-152
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity2.5 MW
StateNew Jersey
CountyWarren
Point of interconnection
Requested (queue) date2010-10-29
Proposed in-service date2011-04-01
Operational date
Withdrawn date2011-12-21
Developer
Utility / transmission ownerJCPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.