Morris Park 12kV (X3-025)

Morris Park 12kV is a 1.8 MW solar interconnection project in Warren, New Jersey with a current status of withdrawn.

1.8 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameMorris Park 12kV
Queue IDX3-025
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity1.8 MW
StateNew Jersey
CountyWarren
Point of interconnection
Requested (queue) date2011-08-29
Proposed in-service date2012-06-01
Operational date
Withdrawn date2012-03-14
Developer
Utility / transmission ownerJCPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.