Morris Ridge Solar Energy Center (0717)

Morris Ridge Solar Energy Center is a 177.0 MW solar interconnection project in Steuben, New York with a current status of operational. It is proposed to connect at South Perry - Meyer 230kV.

177.0 MWCapacity
OperationalStatus
CMarket
SolarTechnology

Project facts

Canonical nameMorris Ridge Solar Energy Center
Queue ID0717
Statusoperational
Source status14
MarketC
TechnologySolar
Capacity177.0 MW
StateNew York
CountySteuben
Point of interconnectionSouth Perry - Meyer 230kV
Requested (queue) date2018-06-04
Proposed in-service date
Operational date
Withdrawn date
DeveloperMorris Ridge Solar Energy Center, LLC
Utility / transmission ownerNYSEG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata