Moshannon-East Towanda 230kV (AA1-111)

Moshannon-East Towanda 230kV is a 463.0 MW gas interconnection project in Clinton, Pennsylvania with a current status of withdrawn.

463.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameMoshannon-East Towanda 230kV
Queue IDAA1-111
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyGas
Capacity463.0 MW
StatePennsylvania
CountyClinton
Point of interconnection
Requested (queue) date2014-10-31
Proposed in-service date2025-06-30
Operational date
Withdrawn date2023-04-20
Developer
Utility / transmission ownerPENELEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata