Moss Ridge Solar (1075)

Moss Ridge Solar is a 46.0 MW solar interconnection project in St. Lawrence, New York with a current status of withdrawn. It is proposed to connect at Colton - Battle Hill, 115 kV .

46.0 MWCapacity
WithdrawnStatus
EMarket
SolarTechnology

Project facts

Canonical nameMoss Ridge Solar
Queue ID1075
Statuswithdrawn
Source status0
MarketE
TechnologySolar
Capacity46.0 MW
StateNew York
CountySt. Lawrence
Point of interconnectionColton - Battle Hill, 115 kV
Requested (queue) date2020-08-11
Proposed in-service date2020-09-30
Operational date
Withdrawn date
DeveloperMoss Ridge Solar 1, LLC
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata