Moss Rock Storage (28INR0438)
Moss Rock Storage is a 157.1 MW other interconnection project in Mills, Texas with a current status of operational. It is proposed to connect at #7070 Goldthwaite 138kV.
157.1 MWCapacity
OperationalStatus
MillsMarket
OtherTechnology
Project facts
| Canonical name | Moss Rock Storage |
|---|---|
| Queue ID | 28INR0438 |
| Status | operational |
| Source status | SS Completed, FIS Started, No IA |
| Market | Mills |
| Technology | Other |
| Capacity | 157.1 MW |
| State | Texas |
| County | Mills |
| Point of interconnection | #7070 Goldthwaite 138kV |
| Requested (queue) date | 2025-09-22 |
| Proposed in-service date | — |
| Operational date | 2029-12-31 |
| Withdrawn date | — |
| Developer | Invenergy |
| Utility / transmission owner | ERCOT |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.