Moss Rock Storage (28INR0438)

Moss Rock Storage is a 157.1 MW other interconnection project in Mills, Texas with a current status of operational. It is proposed to connect at #7070 Goldthwaite 138kV.

157.1 MWCapacity
OperationalStatus
MillsMarket
OtherTechnology

Project facts

Canonical nameMoss Rock Storage
Queue ID28INR0438
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketMills
TechnologyOther
Capacity157.1 MW
StateTexas
CountyMills
Point of interconnection#7070 Goldthwaite 138kV
Requested (queue) date2025-09-22
Proposed in-service date
Operational date2029-12-31
Withdrawn date
DeveloperInvenergy
Utility / transmission ownerERCOT

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata