Mount Hope Storage (C24-215)

Mount Hope Storage is a 50.0 MW battery interconnection project in Orange, New York with a current status of withdrawn. It is proposed to connect at Cuddebackville-Shoemaker stations 69 kV Line #13.

50.0 MWCapacity
WithdrawnStatus
NYISOMarket
BatteryTechnology

Project facts

Canonical nameMount Hope Storage
Queue IDC24-215
Statuswithdrawn
Source statuswithdrawn
MarketNYISO
TechnologyBattery
Capacity50.0 MW
StateNew York
CountyOrange
Point of interconnectionCuddebackville-Shoemaker stations 69 kV Line #13
Requested (queue) date2024-09-20
Proposed in-service date
Operational date
Withdrawn date
DeveloperMount Hope Stand Alone Storage 1, LLC
Utility / transmission ownerO&R

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.