Mount Storm Repower (AH1-254)

Mount Storm Repower is a 171.4 MW wind interconnection project in Barbour, West Virginia with a current status of active. It is proposed to connect at Greenland Gap 500 kV II.

171.4 MWCapacity
ActiveStatus
PJMMarket
WindTechnology

Project facts

Canonical nameMount Storm Repower
Queue IDAH1-254
Statusactive
Source statusactive
MarketPJM
TechnologyWind
Capacity171.4 MW
StateWest Virginia
CountyBarbour
Point of interconnectionGreenland Gap 500 kV II
Requested (queue) date2025-01-29
Proposed in-service date2025-07-31
Operational date
Withdrawn date
DeveloperRenew Development HoldCo LLC
Utility / transmission ownerAPS

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.