MRG Goody Solar Project Hybrid (66390_GDYPV)

MRG Goody Solar Project Hybrid is a 170.8 MW solar interconnection project in Lamar, Texas with a current status of active.

170.8 MWCapacity
ActiveStatus
ERCOMarket
SolarTechnology

Project facts

Canonical nameMRG Goody Solar Project Hybrid
Queue ID66390_GDYPV
Statusactive
Source status(V) Under construction, more than 50 percent complete
MarketERCO
TechnologySolar
Capacity170.8 MW
StateTexas
CountyLamar
Point of interconnection
Requested (queue) date
Proposed in-service date2026-07-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerNexus Renewable Power, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectactivehigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.