Mt Olive Solar 1 (59645_FLS1)

Mt Olive Solar 1 is a 5.0 MW solar interconnection project in Wayne, North Carolina with a current status of operational.

5.0 MWCapacity
OperationalStatus
CPLEMarket
SolarTechnology

Project facts

Canonical nameMt Olive Solar 1
Queue ID59645_FLS1
Statusoperational
Source status(OP) Operating
MarketCPLE
TechnologySolar
Capacity5.0 MW
StateNorth Carolina
CountyWayne
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2015-05-01
Withdrawn date—
Developer—
Utility / transmission ownerCypress Creek Renewables

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata