Mt. Storm 115kV (X2-086)

Mt. Storm 115kV is a 77.0 MW other interconnection project in Grant, West Virginia with a current status of withdrawn.

77.0 MWCapacity
WithdrawnStatus
Market
OtherTechnology

Project facts

Canonical nameMt. Storm 115kV
Queue IDX2-086
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyOther
Capacity77.0 MW
StateWest Virginia
CountyGrant
Point of interconnection
Requested (queue) date2011-07-29
Proposed in-service date2014-12-01
Operational date
Withdrawn date2012-01-09
Developer
Utility / transmission ownerDominion

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata