Mud Cat Solar SLF is a 100.5 MW solar interconnection project in Lamar, Texas with a current status of operational. It is proposed to connect at Tap 138KV 11768 Hawk Hollow – 1768 Deport.

100.5 MWCapacity
OperationalStatus
LamarMarket
SolarTechnology

Project facts

Canonical nameMud Cat Solar SLF
Queue ID25INR0505
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketLamar
TechnologySolar
Capacity100.5 MW
StateTexas
CountyLamar
Point of interconnectionTap 138KV 11768 Hawk Hollow – 1768 Deport
Requested (queue) date2023-10-20
Proposed in-service date
Operational date2028-09-18
Withdrawn date
DeveloperMud Cat Solar, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata