Muddy Run 230kV (B28)

Muddy Run 230kV is a 160.0 MW other interconnection project in York, Pennsylvania with a current status of operational.

160.0 MWCapacity
OperationalStatus
Market
OtherTechnology

Project facts

Canonical nameMuddy Run 230kV
Queue IDB28
Statusoperational
Source statusIn Service
Market
TechnologyOther
Capacity160.0 MW
StatePennsylvania
CountyYork
Point of interconnection
Requested (queue) date1999-11-12
Proposed in-service date
Operational date2003-08-27
Withdrawn date
Developer
Utility / transmission ownerPECO

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata