Mulberry Cogeneration Facility (54426_GT1)

Mulberry Cogeneration Facility is a 82.0 MW gas interconnection project in Polk, Florida with a current status of operational.

82.0 MWCapacity
OperationalStatus
FPCMarket
GasTechnology

Project facts

Canonical nameMulberry Cogeneration Facility
Queue ID54426_GT1
Statusoperational
Source status(OP) Operating
MarketFPC
TechnologyGas
Capacity82.0 MW
StateFlorida
CountyPolk
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date1994-05-01
Withdrawn date
Developer
Utility / transmission ownerFlorida Municipal Power Agency (FL)

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata