Mullen Creek 345kV Substation (GEN-2018-022)

Mullen Creek 345kV Substation is a 300.0 MW solar interconnection project in Nodaway, Missouri with a current status of withdrawn. It is proposed to connect at Mullen Creek 345kV Substation.

300.0 MWCapacity
WithdrawnStatus
MOMarket
SolarTechnology

Project facts

Canonical nameMullen Creek 345kV Substation
Queue IDGEN-2018-022
Statuswithdrawn
Source statusWITHDRAWN
MarketMO
TechnologySolar
Capacity300.0 MW
StateMissouri
CountyNodaway
Point of interconnectionMullen Creek 345kV Substation
Requested (queue) date2018-05-25
Proposed in-service date2025-07-15
Operational date
Withdrawn date2024-03-12
Developer
Utility / transmission ownerGMO

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata