GMO — Interconnection Queue Projects
GMO is associated with 23 tracked interconnection projects representing 2,356 MW of requested capacity.
Entity resolution: single source organization name; no cluster merge applied.
23Projects
3Active
3Operational
12Withdrawn
2,356 MWRequested capacity
0Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 14 | 1,168 MW |
| Wind | 5 | 968 MW |
| Battery | 3 | 190 MW |
| Gas | 1 | 29 MW |
Geographic footprint
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Mullen Creek 345kV Substation | GEN-2018-022 | Solar | 300.0 MW | withdrawn | Nodaway, Missouri |
| Nebraska City-Mullen Creek (Holt County MO) 345kV | GEN-2016-115 | Wind | 300.0 MW | operational | Atchison, Missouri |
| Nebraska City-Mullen Creek (Holt County MO) 345kV | GEN-2014-021 | Wind | 300.0 MW | operational | Atchison, Missouri |
| Sibley 345kV substation | GEN-2018-038 | Solar | 203.4 MW | withdrawn | Ray, Missouri |
| Mullen Creek-Sibley (Ketchum) 345kV | GEN-2015-005 | Wind | 200.1 MW | operational | DeKalb County, Missouri |
| Windsor to AEC Sedalia 161 kV line | GEN-2020-072 | Solar | 150.0 MW | active | Windsor, Missouri |
| Tap Saint Joseph - Cooper 345kV (GEN-2010-056 Tap) | GEN-2013-026 | Wind | 150.0 MW | withdrawn | Holt, Missouri |
| KC South - N. Raymore 161kV Line | GEN-2018-054 | Solar | 120.0 MW | withdrawn | Linn, Kansas |
| Duncan Road 161 kV Substation | GEN-2022-031 | Battery | 100.0 MW | withdrawn | Jackson County, Missouri |
| Windsor to AEC Sedalia 161 kV | GEN-2021-077 | Solar | 95.0 MW | active | Pettis, Missouri |
| Archie 161kV substation | GEN-2018-084 | Solar | 80.0 MW | withdrawn | Linn, Missouri |
| KC South-N. Raymore 161kV Line | GEN-2018-121 | Battery | 50.0 MW | withdrawn | Cass, Missouri |
| Archie 161kV substation | GEN-2018-114 | Battery | 40.0 MW | withdrawn | Linn, Kansas |
| Tap Rock Creek-Lane 34.5kV | ASGI-2018-011 | Solar | 35.0 MW | unknown | Franklin, Kansas |
| Tap Rock Creek-Lane 34.5kV | ASGI-2018-012 | Solar | 35.0 MW | withdrawn | Franklin, Kansas |
| Tap Wal-Mart-Rock Creek 34.5kV | ASGI-2018-010 | Solar | 35.0 MW | unknown | Franklin, Kansas |
| Tap Paola-Drexel Corners 34.5kV | ASGI-2018-009 | Solar | 35.0 MW | withdrawn | Miami, Kansas |
| Pleasant Hill 345/161/69 kV Substation | GEN-2020-061 | Gas | 29.0 MW | active | Pleasant Hill, Missouri |
| Tap Metz-Dederick Junction 34.5kV | ASGI-2018-006 | Solar | 20.0 MW | unknown | Vernon County, Missouri |
| Tap Salisbury - Glasgow 34.5kV | ASGI-2018-007 | Solar | 20.0 MW | unknown | Chariton County, Missouri |
| Tap Bush City-Centerville 34.5kV | ASGI-2018-008 | Solar | 20.0 MW | withdrawn | Linn, Kansas |
| Tap Appleton - Rockbille 34.5kV | ASGI-2018-003 | Solar | 20.0 MW | unknown | Appleton City, Missouri |
| Nebraska City – Sibley 345kV | GEN-2016-040 | Wind | 18.4 MW | withdrawn | Dekalb County, Missouri |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.