Murphysboro 2 (69860_MURP2)

Murphysboro 2 is a 1.3 MW solar interconnection project in Jackson, Illinois with a current status of active.

1.3 MWCapacity
ActiveStatus
PJMMarket
SolarTechnology

Project facts

Canonical nameMurphysboro 2
Queue ID69860_MURP2
Statusactive
Source status(T) Regulatory approvals received. Not under construction
MarketPJM
TechnologySolar
Capacity1.3 MW
StateIllinois
CountyJackson
Point of interconnection—
Requested (queue) date—
Proposed in-service date2027-10-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerNavisun LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-10-02proposed_online_date2027-03-012027-10-01medium
2026-08-02new_project—activehigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata