Muskingum River 345 kV Phase I (AD1-090)

Muskingum River 345 kV Phase I is a 1,260.0 MW gas interconnection project in Washington, Ohio with a current status of withdrawn.

1,260.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameMuskingum River 345 kV Phase I
Queue IDAD1-090
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyGas
Capacity1,260.0 MW
StateOhio
CountyWashington
Point of interconnection
Requested (queue) date2017-09-18
Proposed in-service date2022-01-01
Operational date
Withdrawn date2019-08-30
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata