Mustang 230kV (GEN-2015-040)

Mustang 230kV is a 50.1 MW solar interconnection project in Yoakum County, Texas with a current status of withdrawn. It is proposed to connect at Mustang 230kV.

50.1 MWCapacity
WithdrawnStatus
TXMarket
SolarTechnology

Project facts

Canonical nameMustang 230kV
Queue IDGEN-2015-040
Statuswithdrawn
Source statusWITHDRAWN
MarketTX
TechnologySolar
Capacity50.1 MW
StateTexas
CountyYoakum County
Point of interconnectionMustang 230kV
Requested (queue) date2015-09-30
Proposed in-service date
Operational date
Withdrawn date2018-07-30
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.