Mustang 230kV (GEN-2015-040)
Mustang 230kV is a 50.1 MW solar interconnection project in Yoakum County, Texas with a current status of withdrawn. It is proposed to connect at Mustang 230kV.
50.1 MWCapacity
WithdrawnStatus
TXMarket
SolarTechnology
Project facts
| Canonical name | Mustang 230kV |
|---|---|
| Queue ID | GEN-2015-040 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | TX |
| Technology | Solar |
| Capacity | 50.1 MW |
| State | Texas |
| County | Yoakum County |
| Point of interconnection | Mustang 230kV |
| Requested (queue) date | 2015-09-30 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | 2018-07-30 |
| Developer | — |
| Utility / transmission owner | SPS |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata