Mutz Solar (28INR0463)

Mutz Solar is a 72.8 MW solar interconnection project in Atascosa, Texas with a current status of operational. It is proposed to connect at Tap 69 kV 5693 San Miguel Tap - 5698 North Calliham Sub.

72.8 MWCapacity
OperationalStatus
AtascosaMarket
SolarTechnology

Project facts

Canonical nameMutz Solar
Queue ID28INR0463
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketAtascosa
TechnologySolar
Capacity72.8 MW
StateTexas
CountyAtascosa
Point of interconnectionTap 69 kV 5693 San Miguel Tap - 5698 North Calliham Sub
Requested (queue) date2026-01-13
Proposed in-service date
Operational date2028-06-30
Withdrawn date
DeveloperAETS Development Holdings LLC
Utility / transmission ownerERCOT

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata