Myrtle Solar, LLC (66910_MYR)

Myrtle Solar, LLC is a 313.0 MW solar interconnection project in Brazoria, Texas with a current status of active.

313.0 MWCapacity
ActiveStatus
ERCOMarket
SolarTechnology

Project facts

Canonical nameMyrtle Solar, LLC
Queue ID66910_MYR
Statusactive
Source status(TS) Construction complete, but not yet in commercial operation
MarketERCO
TechnologySolar
Capacity313.0 MW
StateTexas
CountyBrazoria
Point of interconnection—
Requested (queue) date—
Proposed in-service date2026-12-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerMyrtle Solar, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-11-01proposed_online_date2026-10-012026-12-01medium
2026-10-02proposed_online_date2026-09-012026-10-01medium
2026-09-02proposed_online_date2026-08-012026-09-01medium
2026-08-02new_project—activehigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata