Myrtle Solar Repower (27INR0636)
Myrtle Solar Repower is a 314.3 MW solar interconnection project in Brazoria, Texas with a current status of operational. It is proposed to connect at 42110 Angleton 138kV.
314.3 MWCapacity
OperationalStatus
BrazoriaMarket
SolarTechnology
Project facts
| Canonical name | Myrtle Solar Repower |
|---|---|
| Queue ID | 27INR0636 |
| Status | operational |
| Source status | SS Completed, FIS Completed, No IA |
| Market | Brazoria |
| Technology | Solar |
| Capacity | 314.3 MW |
| State | Texas |
| County | Brazoria |
| Point of interconnection | 42110 Angleton 138kV |
| Requested (queue) date | 2026-09-10 |
| Proposed in-service date | — |
| Operational date | 2027-06-21 |
| Withdrawn date | — |
| Developer | Myrtle Solar, LLC |
| Utility / transmission owner | ERCOT |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-10-30 | new_project | — | operational | high |
Explore related data
Source last checked2026-10-30
Data last materially changed2026-10-30
Page data generated2026-11-26
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.