Mystic Springs Renewable Energy (Hybrid) (67987_MYSPB)

Mystic Springs Renewable Energy (Hybrid) is a 250.0 MW battery interconnection project in Kaufman, Texas with a current status of active.

250.0 MWCapacity
ActiveStatus
ERCOMarket
BatteryTechnology

Project facts

Canonical nameMystic Springs Renewable Energy (Hybrid)
Queue ID67987_MYSPB
Statusactive
Source status(P) Planned for installation, but regulatory approvals not initiated
MarketERCO
TechnologyBattery
Capacity250.0 MW
StateTexas
CountyKaufman
Point of interconnection
Requested (queue) date
Proposed in-service date2028-03-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerVesper Energy Development LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectactivehigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata