N200S PV Project (LG-17-3-1)

N200S PV Project is a 170.0 MW solar interconnection project in El Paso, Texas with a current status of withdrawn. It is proposed to connect at Newman Substation.

170.0 MWCapacity
WithdrawnStatus
WestMarket
SolarTechnology

Project facts

Canonical nameN200S PV Project
Queue IDLG-17-3-1
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar
Capacity170.0 MW
StateTexas
CountyEl Paso
Point of interconnectionNewman Substation
Requested (queue) date2017-03-30
Proposed in-service date2020-12-31
Operational date
Withdrawn date2019-02-28
Developer
Utility / transmission ownerEl Paso Electric Company

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata