NaturEner Glacier Wind Energy 2 (57050_NGW2)

NaturEner Glacier Wind Energy 2 is a 103.5 MW wind interconnection project in Toole, Montana with a current status of operational.

103.5 MWCapacity
OperationalStatus
GWAMarket
WindTechnology

Project facts

Canonical nameNaturEner Glacier Wind Energy 2
Queue ID57050_NGW2
Statusoperational
Source status(OP) Operating
MarketGWA
TechnologyWind
Capacity103.5 MW
StateMontana
CountyToole
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2009-11-01
Withdrawn date
Developer
Utility / transmission ownerNaturEner Glacier Wind Energy 1 LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata