Toole County, Montana — Interconnection Projects
The interXdata warehouse tracks 3 interconnection projects in Toole, Montana, representing 399 MW of requested capacity.
3Total projects
0Active
3Operational
0Withdrawn
399 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Wind | 3 | 399 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| NaturEner Rim Rock Energy | 57995_RR | Wind | 189.0 MW | operational | Toole, Montana |
| NaturEner Glacier Wind Energy 1 | 57049_NGW1 | Wind | 106.5 MW | operational | Toole, Montana |
| NaturEner Glacier Wind Energy 2 | 57050_NGW2 | Wind | 103.5 MW | operational | Toole, Montana |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Toole County.
Start tracking with interXdata