Naugatuck Avenue Battery Storage (1089)
Naugatuck Avenue Battery Storage is a 205.3 MW battery interconnection project in New Haven, Connecticut with a current status of active. It is proposed to connect at Devon 115 kV open position between 4T and 5T.
205.3 MWCapacity
ActiveStatus
SWCTMarket
BatteryTechnology
Project facts
| Canonical name | Naugatuck Avenue Battery Storage |
|---|---|
| Queue ID | 1089 |
| Status | active |
| Source status | A |
| Market | SWCT |
| Technology | Battery |
| Capacity | 205.3 MW |
| State | Connecticut |
| County | New Haven |
| Point of interconnection | Devon 115 kV open position between 4T and 5T |
| Requested (queue) date | 2021-01-08 |
| Proposed in-service date | 2028-10-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata