Naugatuck Avenue Battery Storage (1089)

Naugatuck Avenue Battery Storage is a 205.3 MW battery interconnection project in New Haven, Connecticut with a current status of active. It is proposed to connect at Devon 115 kV open position between 4T and 5T.

205.3 MWCapacity
ActiveStatus
SWCTMarket
BatteryTechnology

Project facts

Canonical nameNaugatuck Avenue Battery Storage
Queue ID1089
Statusactive
Source statusA
MarketSWCT
TechnologyBattery
Capacity205.3 MW
StateConnecticut
CountyNew Haven
Point of interconnectionDevon 115 kV open position between 4T and 5T
Requested (queue) date2021-01-08
Proposed in-service date2028-10-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.