NavBoot BESS (25INR0375)

NavBoot BESS is a 303.7 MW other interconnection project in Nueces, Texas with a current status of operational. It is proposed to connect at 8858 MCKENZIE4A 138kV.

303.7 MWCapacity
OperationalStatus
NuecesMarket
OtherTechnology

Project facts

Canonical nameNavBoot BESS
Queue ID25INR0375
Statusoperational
Source statusSS Completed, FIS Started, IA
MarketNueces
TechnologyOther
Capacity303.7 MW
StateTexas
CountyNueces
Point of interconnection8858 MCKENZIE4A 138kV
Requested (queue) date2023-03-13
Proposed in-service date
Operational date2027-11-11
Withdrawn date
DeveloperNavboot BESS LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.