ND Queue Project MPC02100 — Wind in Oliver, North Dakota

ND Queue Project MPC02100 — Wind in Oliver, North Dakota is a 100.0 MW wind interconnection project in Oliver, North Dakota with a current status of operational. It is proposed to connect at Center - Mandan 230 kV Line.

100.0 MWCapacity
OperationalStatus
NDMarket
WindTechnology

Project facts

Canonical nameND Queue Project MPC02100 — Wind in Oliver, North Dakota
Queue IDMPC02100
Statusoperational
Source status
MarketND
TechnologyWind
Capacity100.0 MW
StateNorth Dakota
CountyOliver
Point of interconnectionCenter - Mandan 230 kV Line
Requested (queue) date2008-12-12
Proposed in-service date2016-12-31
Operational date2016-12-31
Withdrawn date
Developer
Utility / transmission ownerMinnkota Power Cooperative

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: minnkota-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.