ND Queue Project MPC02100 — Wind in Oliver, North Dakota
ND Queue Project MPC02100 — Wind in Oliver, North Dakota is a 100.0 MW wind interconnection project in Oliver, North Dakota with a current status of operational. It is proposed to connect at Center - Mandan 230 kV Line.
100.0 MWCapacity
OperationalStatus
NDMarket
WindTechnology
Project facts
| Canonical name | ND Queue Project MPC02100 — Wind in Oliver, North Dakota |
|---|---|
| Queue ID | MPC02100 |
| Status | operational |
| Source status | — |
| Market | ND |
| Technology | Wind |
| Capacity | 100.0 MW |
| State | North Dakota |
| County | Oliver |
| Point of interconnection | Center - Mandan 230 kV Line |
| Requested (queue) date | 2008-12-12 |
| Proposed in-service date | 2016-12-31 |
| Operational date | 2016-12-31 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Minnkota Power Cooperative |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: minnkota-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.