NE Queue Project 2008-G11 — Wind in Dawes County, Nebraska

NE Queue Project 2008-G11 — Wind in Dawes County, Nebraska is a 100.5 MW wind interconnection project in Dawes County, Nebraska with a current status of withdrawn. It is proposed to connect at Chadron 115-kV.

100.5 MWCapacity
WithdrawnStatus
NEMarket
WindTechnology

Project facts

Canonical nameNE Queue Project 2008-G11 — Wind in Dawes County, Nebraska
Queue ID2008-G11
Statuswithdrawn
Source statusWithdrawn
MarketNE
TechnologyWind
Capacity100.5 MW
StateNebraska
CountyDawes County
Point of interconnectionChadron 115-kV
Requested (queue) date2008-06-30
Proposed in-service date2012-09-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerWestern Area Power Administration - Rocky Mountain Region

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: wapa-rm-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata