Neal Battery (28INR0452)

Neal Battery is a 120.5 MW other interconnection project in Wharton, Texas with a current status of operational. It is proposed to connect at tap of 138kV 8750 CHARMERP4A - 8127 South Lane City.

120.5 MWCapacity
OperationalStatus
WhartonMarket
OtherTechnology

Project facts

Canonical nameNeal Battery
Queue ID28INR0452
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketWharton
TechnologyOther
Capacity120.5 MW
StateTexas
CountyWharton
Point of interconnectiontap of 138kV 8750 CHARMERP4A - 8127 South Lane City
Requested (queue) date2025-10-21
Proposed in-service date
Operational date2029-04-03
Withdrawn date
DeveloperCH Neal Battery LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata