Nelson-Dixon 138 kV (AF2-393 - moved to TC1)

Nelson-Dixon 138 kV is a 60.0 MW battery interconnection project in Adams, Illinois with a current status of withdrawn.

60.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameNelson-Dixon 138 kV
Queue IDAF2-393 - moved to TC1
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity60.0 MW
StateIllinois
CountyAdams
Point of interconnection
Requested (queue) date2020-03-31
Proposed in-service date2024-09-01
Operational date
Withdrawn date2025-01-22
Developer
Utility / transmission ownerComEd

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.