Nelson-Indian River 138kV (AH1-586 - moved to TC2)

Nelson-Indian River 138kV is a 45.0 MW battery interconnection project in Sussex, Delaware with a current status of withdrawn.

45.0 MWCapacity
WithdrawnStatus
—Market
BatteryTechnology

Project facts

Canonical nameNelson-Indian River 138kV
Queue IDAH1-586 - moved to TC2
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyBattery
Capacity45.0 MW
StateDelaware
CountySussex
Point of interconnection—
Requested (queue) date2021-09-10
Proposed in-service date2028-10-31
Operational date—
Withdrawn date2025-12-02
Developer—
Utility / transmission ownerDPL

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.