Nelson-Lee County Energy Ctr 345kV (R59)

Nelson-Lee County Energy Ctr 345kV is a 160.0 MW wind interconnection project in Bureau, Illinois with a current status of withdrawn.

160.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameNelson-Lee County Energy Ctr 345kV
Queue IDR59
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity160.0 MW
StateIllinois
CountyBureau
Point of interconnection
Requested (queue) date2007-01-03
Proposed in-service date2008-12-31
Operational date
Withdrawn date2010-01-25
Developer
Utility / transmission ownerComEd

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata