Neosho Ridge - Caney River 345 kV Line (GEN-2024-125)

Neosho Ridge - Caney River 345 kV Line is a 400.0 MW solar interconnection project in Elk, Kansas with a current status of operational. It is proposed to connect at Neosho Ridge - Caney River 345 kV Line.

400.0 MWCapacity
OperationalStatus
KSMarket
SolarTechnology

Project facts

Canonical nameNeosho Ridge - Caney River 345 kV Line
Queue IDGEN-2024-125
Statusoperational
Source statusDISIS STAGE
MarketKS
TechnologySolar
Capacity400.0 MW
StateKansas
CountyElk
Point of interconnectionNeosho Ridge - Caney River 345 kV Line
Requested (queue) date2025-03-01
Proposed in-service date
Operational date2028-05-01
Withdrawn date
Developer
Utility / transmission ownerWERE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata