Elk County, Kansas — Interconnection Projects

The interXdata warehouse tracks 3 interconnection projects in Elk, Kansas, representing 900 MW of requested capacity.

3Total projects
0Active
2Operational
1Withdrawn
900 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar2700 MW
Wind1200 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Neosho Ridge - Caney River 345 kV LineGEN-2024-125Solar400.0 MWoperationalElk, Kansas
Caney River 345 kV SubstationGEN-2023-200Solar300.0 MWwithdrawnElk, Kansas
Caney River Wind Project57858_1Wind200.0 MWoperationalElk, Kansas

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Elk County.