NEP LNS (1321)

NEP LNS is a 17.6 MW generation interconnection project in Somerset, Massachusetts with a current status of withdrawn. It is proposed to connect at NEP 115 kV Brayton Point.

17.6 MWCapacity
WithdrawnStatus
SEMAMarket
GenerationTechnology

Project facts

Canonical nameNEP LNS
Queue ID1321
Statuswithdrawn
Source statusW
MarketSEMA
TechnologyGeneration
Capacity17.6 MW
StateMassachusetts
CountySomerset
Point of interconnectionNEP 115 kV Brayton Point
Requested (queue) date2022-10-06
Proposed in-service date2024-12-01
Operational date
Withdrawn date2022-11-30
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata