Neptune Energy Center Hybrid (63731_NT125)

Neptune Energy Center Hybrid is a 125.0 MW battery interconnection project in Pueblo, Colorado with a current status of operational.

125.0 MWCapacity
OperationalStatus
PSCOMarket
BatteryTechnology

Project facts

Canonical nameNeptune Energy Center Hybrid
Queue ID63731_NT125
Statusoperational
Source status(OP) Operating
MarketPSCO
TechnologyBattery
Capacity125.0 MW
StateColorado
CountyPueblo
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2023-06-01
Withdrawn date—
Developer—
Utility / transmission ownerNeptune Energy Center, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata