Network Load Expansion 3 (L0380)

Network Load Expansion 3 is a 300.0 MW other interconnection project in Wasco, Oregon with a current status of operational. It is proposed to connect at Chenoweth Substation.

300.0 MWCapacity
OperationalStatus
ORMarket
OtherTechnology

Project facts

Canonical nameNetwork Load Expansion 3
Queue IDL0380
Statusoperational
Source statusENERGIZED
MarketOR
TechnologyOther
Capacity300.0 MW
StateOregon
CountyWasco
Point of interconnectionChenoweth Substation
Requested (queue) date2014-11-20
Proposed in-service date
Operational date2018-10-01
Withdrawn date
DeveloperNorthern Wasco County People's Utility District
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata