Network Load Expansion Phase 2 (L0361)

Network Load Expansion Phase 2 is a 112.0 MW other interconnection project in Wasco, Oregon with a current status of operational. It is proposed to connect at Discovery Substation.

112.0 MWCapacity
OperationalStatus
ORMarket
OtherTechnology

Project facts

Canonical nameNetwork Load Expansion Phase 2
Queue IDL0361
Statusoperational
Source statusENERGIZED
MarketOR
TechnologyOther
Capacity112.0 MW
StateOregon
CountyWasco
Point of interconnectionDiscovery Substation
Requested (queue) date2013-06-27
Proposed in-service date
Operational date2017-10-01
Withdrawn date
DeveloperNorthern Wasco County People's Utility District
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata