Neutron Storage (26INR0252)

Neutron Storage is a 104.5 MW other interconnection project in McLennan, Texas with a current status of operational. It is proposed to connect at Tap 345kV 13405 Trading House - 68090 Sam Switch.

104.5 MWCapacity
OperationalStatus
McLennanMarket
OtherTechnology

Project facts

Canonical nameNeutron Storage
Queue ID26INR0252
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketMcLennan
TechnologyOther
Capacity104.5 MW
StateTexas
CountyMcLennan
Point of interconnectionTap 345kV 13405 Trading House - 68090 Sam Switch
Requested (queue) date2023-09-08
Proposed in-service date
Operational date2028-04-29
Withdrawn date
DeveloperElawan Neutron Storage, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata